01. CONSULTATION AND QUOTE
A member of our team will come to your home and discuss your bathroom needs and look at what is possible in terms of tiling, plumbing, electrical and layout. This will be the time to share ideas and ask questions regarding time-frames, budget, fixtures, fittings and placement of shower, toilet, vanity and bath (if required). We will support you to choose from our quality range of taps, vanities and fixtures. If you wish to make a selection from a different range, not a problem, we just ask that your selections are available when required, generally at commencement of works. We will then re-visit you and provide you with some tile choices. If you have a tile in mind, once again not a problem, we just ask that they are on site prior to commencement. We will provide you with a final quote and commencement date, when you decide to go ahead.
02. COMMENCEMENT OF WORKS
A rubbish skip will arrive at your home before works commence. Demolition of your bathroom will typically take no more than a day, however if we need to re-build any wall or replace a window, this will take a little more time. Demolition will include removing the tile screed, this is the sand/cement mix below the tiles which allows for any run off to drains. A plumber will generally complete any plumbing works on the first day or second day. Once any building works and plumbing are complete, the tiling will commence. The first day the tiler will replace the tile screed, then complete the waterproofing the following day and then commence tiling. Tile completion generally takes 3-4 days depending on the complexity and size of the bathroom.
03. FIT OUT AND GLASS MEASURE
Once the tiling and grouting are complete, our team will install the vanity, toilet (where required), fixtures and fittings, taps and any other accessories you have chosen. At the same time, a final measure will be done by our glazing specialist for the shower screen and mirror. Final installation of the glazing will take approximately one to two weeks. We aim to have your bathroom complete within three weeks however there are times when the size and complexity of the job mean it will take a little longer.
04. ENJOY YOUR BEAUTIFUL NEW INFINITY BATHROOM!
It's time to start using your new Infinity Bathroom and start living with your new dream bathroom!